I'm an Engineering Manager who still ships. In my current role I own one B2B SaaS product end to end: an Electron desktop client, a React web app, and Node.js services on AWS. This page is the recent record, dated and specific, with the product and customer names left out.
225commits landed in 14 days
36pull requests merged
7production releases
20major Electron versions crossed in one upgrade
12 to 25 November 2026. Much of the code is written with AI agents under my direction and review; every release decision is mine.
Quest log
Three weeks, seven levels
Oldest first. Each level is something that reached staging or production. Scroll to play through it.
Level 7 of 7
24 Nov
You
1
Level 1 · 10 Nov 2026
DesktopPlatform
Moved the desktop client from Electron 25 to Electron 45
Twenty major versions in one planned upgrade: a new security model (narrowed entitlements, encrypted local captures, a strict CSP), silent auto-updates, and a tracking pipeline rebuilt so that it does not lose data when the app restarts.
LootA bridge release I designed, so the installed base moves to the new generation without anyone reinstalling.
2
Level 2 · 20–22 Nov 2026
Security
Ran a security hardening sprint from scan to production
Security headers and a report-only Content Security Policy on the production web app, an HTTPS-only API, DNSSEC signing with keys held in a managed KMS, DMARC monitoring on the mail domain, and a runtime upgrade to Node 22 on staging.
3
Level 3 · 21 Nov 2026
ProductionRelease engineering
Released the new web and API generation overnight
A written runbook, a database snapshot, and a named rollback target before the first command. The release ran in the customer's quiet hours and nobody noticed, which is the point.
4
Level 4 · 22–23 Nov 2026
DesktopRollout
Put the rebuilt desktop app in front of a pilot group
Shipped signed pre-release builds for macOS (Apple Silicon and Intel) and Windows (installer and MSI), released them to a pilot team on production, and supported those users directly while watching the telemetry.
5
Level 5 · 23 Nov 2026
ProductionReal-time
Stood up a production video-calling service
Deployed a selective-forwarding (SFU) media service on AWS ECS with fixed media ports, separate from the main API, and verified calls and screen sharing end to end.
6
Boss level · 23 Nov 2026
IncidentProduction
Diagnosed a production slowdown to one query pattern
Reads that normally take milliseconds were running for more than 800 seconds and holding the database at its I/O ceiling. I traced it to history scans from one dashboard, mitigated it the same day, and wrote up the cause and the fix.
Boss: 800 s+ queryBeaten on level 7
7
Level clearedLevel 7 · 24 Nov 2026
ProductionDatabase
Fixed the root cause with zero downtime
Added the missing composite index to the busiest table online, with no lock and no maintenance window, then merged guard rails so the same query shape cannot reach production again.
LootFour production releases the same day, each with a rollback path.
Level 8 · Locked
Your team?
The next level is a principal engineer or engineering manager role on a product that matters. If that's what you're hiring for, I'd like to hear about it.
A read-only MCP server over product data, with access scoped per workspace and query definitions that match the product's own reports, so answers agree with what customers see.
Product
A guided in-app tour
A custom product tour in the web app, built on a small anchor contract so that new screens can join it without touching the tour engine.
Leadership
Review, unblock, release
I review and merge teammates' pull requests daily, own the release train across four deployables, and answer pilot users myself when something breaks.
How I work
An agent-first engineering workflow, measured
I run AI coding agents the way I would run a team: written briefs, reviews, runbooks, and a human decision before anything reaches production.
19agent sessions on the busiest day
16,423agent replies in 14 days
13.6Moutput tokens generated
98%of input served from cache
Counted from my own session logs, 12 to 25 November 2026. I write about what works and what does not in Field Notes.
Hiring for a principal or EM role?
I'm happy to walk through any entry on this page in detail, including the parts that went wrong.